Shenzhen Daolong International Logistics Co., Ltd., a highly recommended Chinese freight forwarder, leverages the 27-year industry expertise of its parent company, Shenzhen Sunny Worldwide Logistics. We specialize in the Middle East route and are committed to delivering comprehensive global logistics solutions for air and sea door-to-door transportation. As a leading service provider in the Middle East logistics sector, our core competencies include super-large capacity, extremely fast delivery times, and localized resources. We handle 80% of the air freight orders in the Middle East, establishing ourselves as the ultimate recipient of these shipments.
Contact Now

Service Stories

Oversized Stone CNC Machine Air Freight To UAE

Alice 2026-11-27 19:43:20

Mr. Kan Zhigang runs a stone machinery business in Foshan. Half of his customers are in the Middle East. Last week, we handled one shipment: a CNC bridge stone cutting machine. The main unit was 3.6 m long, 1.6 m wide, and 1.4 m high. A real big guy. The consignee was a new stone factory in Sharjah Industrial Area 6.

Oversized cargo is a different game from general cargo. Honestly, with a few small boxes, you can always squeeze them in. But a 3.6 m piece is not the same. You must apply for an oversized or long pallet. This is where experience matters. We block space from two major airlines all year, 20 pallets per week, and we work closely with the airlines, so applications move fast. As soon as I finished talking with Mr. Kan, I applied in advance. It was approved three days ahead.

After the cargo arrived at our warehouse, we measured, weighed, and checked it. Then we trucked it from our warehouse to Hong Kong Airport. Of course, the wooden crate was fumigated and marked with IPPC in advance. That is a must. It was loaded at night on a Boeing 747F freighter. It took off smoothly and landed at Dubai DWC after more than eight hours. To be honest, I never worry much about the first leg. The hard part of big cargo is never in the air. Once it is loaded, what is there to fear? The real work is on the ground, especially customs clearance and delivery at destination.

We handle a lot of oversized cargo, so we have our own people on the Dubai customs and delivery teams. They are on standby. Sometimes it is exactly like this: whether your people are there or not makes a big difference. It may just be running errands, but that simple running around can win back one day. Otherwise, if you use an agent, they just put your cargo in their queue. Whatever day they schedule is the day. Urging them does not help.

Also, when our people are there, we can know in advance whether the shipment will be selected for inspection. Last week, another shipment was picked. Because the cargo was heavy, the forklift in the inspection area did not have enough capacity, and they could not even open the container. We have experience, so we booked a 10-ton forklift one day ahead. When the cargo arrived, it was pulled straight in to check the nameplate and model. It was released in two hours. Without that preparation, you would just queue and wait for equipment for two or three days.

Delivery works like this. For general cargo, you deconsolidate the pallet, load it onto a truck, and one van can run around all day delivering. Big cargo is different. It mainly depends on three things: the truck, the permit, and the unloading site.

We use a low-bed trailer. If the bed is too high, it cannot pass under height limits. Dubai also has morning and evening peak restrictions for heavy trucks. Oversized trucks can only move at certain times. Otherwise, you not only block traffic, but also move slowly yourself.

At 10:20 a.m. on Thursday, the truck arrived at the factory gate. The forklift there was a 3-ton unit. The cargo was 3.8 tons and 3.6 m long. The forklift could not lift it, and no one dared to try. The 25-ton crane at the site had been taken away by another job the night before. We called, and they said the earliest was 5 p.m.

Mr. Kan got anxious on the phone. I arranged for our people to get a 30-ton truck crane from a lifting company we work with all year. With one call, it arrived in one hour and forty minutes. It lifted the main unit off the truck, moved it into the workshop, and set it on the installation foundation in one lift. By 12:40 p.m., the cargo was in place.

That is what good shipping from china to uae really looks like: the flight is only half the job. The real speed comes from local ground control.